Below is the list of things that we want completed before we move in:
•Convert electrical box to circuit
breaker.
•Take down the wall by the stairs
•Rip up floors in kitchen and
bathroom
•Dining Room
•Strip
wallpaper
•Paint
•Conservatory
•Strip
wallpaper
•Paint
•Upstairs
•Paint
•Kitchen
•Strip
wallpaper
•Tile the floor
•Install
shelves where the dishwasher used to live
•Paint
walls
•Paint
countertops? (my father is super against doing this)
•Bathroom
•Rip
up tile.
•Strip
wallpaper
•Tile
bathtub and floor
•Paint
•Replace
light fixtures
•Replace
medicine cabinet mirror? (it’s grody but usable)
•Reinforce
bathroom floor
•Living Room
•Strip
wallpaper
•Paint
•Strip
paint from fireplace
•Sand and gloss hardwood.
•Move in! (aiming for mid-February)
Next post: Before pictures of the place
No comments:
Post a Comment